Service Hotline
+86 0755-2372 9158
+86 13510477647
Service HotlineService Hotline
+86 135 1047 7647
Wechat consulting
Details
Project Name: Production and Construction Project of High Performance Medical and Health Protection Gloves (Phase II)
Project Location: No. 28, Delong Avenue, Guangzhou (Qingyuan) Industrial Transfer Industrial Park, Qingyuan City, Guangdong Province
Construction unit: Guangdong Kingfa Technology Co., Ltd.
Building scale: The air-conditioned area is about 200,000 ㎡.
Refrigeration machine room: 4 sets of refrigerating mainframes totaling 4000RT, using 4-12° water storage system, cold storage supply and return water temperature 4-12°C, refrigeration supply and return water temperature low temperature: 7-12°C, cold storage tank adopts indoor carbon steel tank The structure has an effective volume of 3100 m³, 1 cold storage tank, a 500 mm inclined temperature layer, a cold storage efficiency of 98%, and a maximum cold storage and discharge capacity of 7890 RTH. The overall system adopts a direct storage and indirect discharge system structure.
Quality and efficiency: The project was successfully accepted and highly praised, with stable operation and an annual saving of about 1.2 million yuan in electricity bills. Economic and social benefits are good.