Room 202, Light Factory Building, East Side of Songbai Road, Jingbei Village, Shangwu Village Committee, Longteng Community, Shiyan Street, Baoan District, Shenzhen City, Guangdong Province, China

+86 13510477647

Service Hotline
Energy Station
Your Current Location :Home » Case » Energy Station  » Nanjing Xinwangda

Service Hotline

+86 135 1047 7647

Details

  • Nanjing Xinwangda
  • Nanjing Xinwangda

Nanjing Xinwangda

Sunwoda Nanjing New Energy Project is the first 30GWh power battery base in East China. The second phase of the project has a 10GWh battery cell and 10GWh battery system production line, using industry-leading lithium-ion battery preparation technology and technology, the products are used in BEV (pure electric vehicle), HEV (hybrid electric vehicle), PHEV (plug-in hybrid electric vehicle) Automobile) and other high-end new energy vehicles, Shenzhen Taiwa Energy Co., Ltd. undertakes the central air-conditioning system control project.

Wechat consulting

微信扫码咨询
Consult now
13510477647

Details

Project name: Phase II of Nanjing Xinwangda New Energy Project

Project Location: Lishui, Nanjing City, Jiangsu Province

Construction unit: Shenzhen Xinwangda Electronics Co., Ltd.

Building scale: The construction land area is about 711 mu, including the R&D building, the newly built workshop and the comprehensive supporting building area of about 860,000 square meters.

Refrigeration machine room: 8 sets of refrigerating main engines, single 2000RT, 16000RT in total, using conventional water machine central air conditioning system. .

Quality and efficiency: The project was successfully accepted, the project was running stably and energy saving, fully meeting the requirements of high-end battery manufacturing process


Copyright © Shenzhen Taiwa Energy Technology Co., Ltd.
Technical Support: Tianzhu.hk