Service Hotline
+86 0755-2372 9158
+86 13510477647
Service HotlineService Hotline
+86 135 1047 7647
Wechat consulting
Details
Referring to American standards or Singapore green building standards, the actual operating energy efficiency of more than 5.0 can be defined as a high-efficiency computer room. Shenzhen Taiwa Energy Technology Co., Ltd. focuses on and provides solutions for high-efficiency computer rooms, from the design stage, equipment research and development, system integration, construction. And later stages of operation and maintenance, covering the whole process of the whole life cycle.
Our company conducts planning, design, construction, commissioning, and operation management based on the whole life cycle of the project, seeks the optimization of dynamic performance at the system level, dilutes the professional needs of operators, and establishes intelligent operation based on unattended control technology. control system. In the construction process, our company realizes the seamless connection and integration of construction operation and design through BIM modeling and prefabricated assembly. The picture below shows the implementation and application of BIM technology in a high-efficiency computer room implemented by our company in a construction site in Huizhou.
3D map of electromechanical tube complex floor
Clearance height profile analysis
Equipment room equipment, pipeline optimization, channel reservation diagram
Overall diagram of the machine room bracket
3D diagram of the overall pipeline and nodes in the computer room
3D View of Smart Process Circulating Cooling Water Plant
Prefabricated construction of valve group in machine room
Overall renderings